ISM Manufacturing Index: July 2015 Preview

The ISM Manufacturing Index is expected to post a modest increase to 54.3 in tomorrow’s update for July vs. the previous month, based on The Capital Spectator’s average point forecast for several econometric estimates. The prediction is well above the neutral 50.0 mark and so the current outlook still calls for moderate growth for this benchmark of economic activity in the US manufacturing sector.

By comparison, three consensus estimates based on recent surveys of economists anticipate a lesser gain for the July ISM data relative to the previous month.

Here’s a closer look at the numbers, followed by brief summaries of the methodologies behind the forecasts that are used to calculate The Capital Spectator’s average prediction:

 

ism.02aug2015

 

VAR-1: A vector autoregression model that analyzes the history of industrial production in context with the ISM Manufacturing Index. The forecasts are run inR with the “vars” package.

VAR-6: A vector autoregression model that analyzes six economic time series in context with the ISM Manufacturing Index. The six additional series: industrial production, private non-farm payrolls, index of weekly hours worked, US stock market (Wilshire 5000), spot oil prices, and the Treasury yield spread (10 year Note less 3-month T-bill). The forecasts are run in R with the “vars” package.

ARIMA: An autoregressive integrated moving average model that analyzes the historical record of the ISM Manufacturing Index in R via the “forecast” package.

ES: An exponential smoothing model that analyzes the historical record of the ISM Manufacturing Index in R via the “forecast” package.

TRI: A model that’s based on combining point forecasts, along with the upper and lower prediction intervals (at the 95% confidence level), via a technique known as triangular distributions. The basic procedure: 1) run a Monte Carlo simulation on the combined forecasts and generate 1 million data points on each forecast series to estimate a triangular distribution; 2) take random samples from each of the simulated data sets and use the expected value with the highest frequency as the prediction. The forecast combinations are drawn from the following projections: Econoday.com’s consensus forecast data and the predictions generated by the models above. The forecasts are run in R with the “triangle” package.

Disclosure: None.

How did you like this article? Let us know so we can better customize your reading experience.

Comments

Leave a comment to automatically be entered into our contest to win a free Echo Show.